Automation index
How much of a Telemarketer’s job can AI already do?
A script comes earlier. Them not hanging up in ten seconds, and not lying, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telemarketer
27%
AI can already do 27% of this job.
#223 / 743
View rankingTelemarketer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, queue and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the no and the one who insults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, GDPR and not pushing extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Target, the bonus and not dressing contacts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The supervisor, quality and not skipping the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they do not hang up, and not lying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scripts
- call queues
- GDPR
- targets
- call quality
- shifts
- contacts
- the no
Sources for this job· O*NET 41-9041.00· ESCO/ISCO 4222
IS WORK OVER?
Power engineer
22%
#395 / 743
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151