Automation index
How much of a Telemarketer’s job can AI already do?
A script comes earlier. Them not hanging up in ten seconds, and not lying, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telemarketer
27%
AI can already do 27% of this job.
#188 / 633
View rankingTelemarketer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, queue and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the no and the one who insults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, GDPR and not pushing extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Target, the bonus and not dressing contacts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The supervisor, quality and not skipping the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they do not hang up, and not lying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scripts
- call queues
- GDPR
- targets
- call quality
- shifts
- contacts
- the no
Sources for this job· O*NET 41-9041.00· ESCO/ISCO 4222
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343