Automation index
How much of a Tender specialist’s job can AI already do?
A specification comes earlier. Filing on time without leaving an empty envelope do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tender specialist
27%
AI can already do 27% of this job.
#182 / 623
View rankingTender specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, requirements and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bid, scoring and the certificate that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Board, clarifications and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the tie and the one that falls.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Sales, the price and not dumping the margin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
On time, and the envelope complete.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- specs
- scoring
- award boards
- certificates
- appeals
- tender calendar
- clarifications
- envelopes
Sources for this job· O*NET 13-1199.00· ESCO/ISCO 2422
IS WORK OVER?
Boilermaker
25%
#216 / 623
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213