Automation index
How much of a Tender specialist’s job can AI already do?
A specification comes earlier. Filing on time without leaving an empty envelope do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tender specialist
27%
AI can already do 27% of this job.
#182 / 623
View rankingTender specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, requirements and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bid, scoring and the certificate that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Board, clarifications and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the tie and the one that falls.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Sales, the price and not dumping the margin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
On time, and the envelope complete.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- specs
- scoring
- award boards
- certificates
- appeals
- tender calendar
- clarifications
- envelopes
Sources for this job· O*NET 13-1199.00· ESCO/ISCO 2422
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142