Automation index
How much of a Tender specialist’s job can AI already do?
A specification comes earlier. Filing on time without leaving an empty envelope do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tender specialist
27%
AI can already do 27% of this job.
#182 / 633
View rankingTender specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, requirements and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bid, scoring and the certificate that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Board, clarifications and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the tie and the one that falls.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Sales, the price and not dumping the margin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
On time, and the envelope complete.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- specs
- scoring
- award boards
- certificates
- appeals
- tender calendar
- clarifications
- envelopes
Sources for this job· O*NET 13-1199.00· ESCO/ISCO 2422
IS WORK OVER?
CNC machinist
24%
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223