Automation index
How much of a Tender specialist’s job can AI already do?
A specification comes earlier. Filing on time without leaving an empty envelope do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tender specialist
27%
AI can already do 27% of this job.
#182 / 633
View rankingTender specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, requirements and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bid, scoring and the certificate that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Board, clarifications and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the tie and the one that falls.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Sales, the price and not dumping the margin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
On time, and the envelope complete.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- specs
- scoring
- award boards
- certificates
- appeals
- tender calendar
- clarifications
- envelopes
Sources for this job· O*NET 13-1199.00· ESCO/ISCO 2422
IS WORK OVER?
Insulation installer
22%
#318 / 633
View rankingInsulation installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, thicknesses and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Fit, seal and the bridge you leave.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Roof, façade and the wind on the scaffold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Barriers, vapour and condensation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The designer, the change and late material.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No bridge, and not crushing the insulation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit insulation
- thermal bridges
- vapour barrier
- thicknesses
- insulated façade
- condensation
- seal panels
- roof
Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124