IS WORK OVER?

Automation index

How much of a Tender specialist’s job can AI already do?

A specification comes earlier. Filing on time without leaving an empty envelope do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tender specialist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, requirements and the calendar.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Bid, scoring and the certificate that is late.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Board, clarifications and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Appeal, the tie and the one that falls.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Sales, the price and not dumping the margin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
On time, and the envelope complete.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • specs
  • scoring
  • award boards
  • certificates
  • appeals
  • tender calendar
  • clarifications
  • envelopes

Sources for this job· O*NET 13-1199.00· ESCO/ISCO 2422

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 179Storyboard artist27%
  2. 180Back-office clerk27%
  3. 181HVAC technician27%
  4. 183Payroll clerk27%
  5. 184Tourist-office officer27%
  6. 185Grants officer27%