Automation index
How much of a Tennis coach’s job can AI already do?
A stroke pattern comes earlier. Getting them on court without wrecking the shoulder do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tennis coach
19%
AI can already do 19% of this job.
#589 / 743
View rankingTennis coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, rally and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Court, the one who hides and the one who overhits.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Competition, the needle and the one who throws the racquet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Shoulder, load and not rushing the event.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Parents, the ranking and not burning the child.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On court, and the shoulder whole.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- rally
- stroke patterns
- court
- shoulder
- ranking
- racquet
- parents
- training load
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142