Automation index
How much of a Textile engineer’s job can AI already do?
A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Textile engineer
27%
AI can already do 27% of this job.
#165 / 623
View rankingTextile engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, weaves and piece QC.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, looms and the warp break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Supplier, cotton and the sustainability card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Finishes, shrinkage and fastness tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The brand, the deadline and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Ten thousand metres the same, and not hiding the bad yardage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dye recipes
- weaves
- looms
- colour fastness
- shrinkage
- piece card
- warp
- textile finishes
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141
IS WORK OVER?
Building surveyor
22%
#321 / 623
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112