IS WORK OVER?

Automation index

How much of a Textile engineer’s job can AI already do?

A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Textile engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, weaves and piece QC.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, looms and the warp break.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Supplier, cotton and the sustainability card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Finishes, shrinkage and fastness tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The brand, the deadline and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Ten thousand metres the same, and not hiding the bad yardage.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dye recipes
  • weaves
  • looms
  • colour fastness
  • shrinkage
  • piece card
  • warp
  • textile finishes

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141

Camera operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schedule, lists and overlays.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Frame, follow and not lose focus.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Kit, cards and backups.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Director, light and sound.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Knees, shoulder and long days.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not wiping a full card.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schedule, lists and overlays
  • Frame, follow and not lose focus
  • Kit, cards and backups
  • Director, light and sound
  • Knees, shoulder and long days
  • Not wiping a full card
  • camara
  • operador de camara
  • camera operator

Sources for this job· O*NET 27-4031.00· ESCO/ISCO 3521

Analyse my job

Jobs with similar scores

  1. 162Materials engineer27%
  2. 163Renewables engineer27%
  3. 164Hydraulic engineer27%
  4. 166Key account manager27%
  5. 167Linguist27%
  6. 168Nuclear medicine physician27%