Automation index
How much of a Textile engineer’s job can AI already do?
A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Textile engineer
27%
AI can already do 27% of this job.
#180 / 733
View rankingTextile engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, weaves and piece QC.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, looms and the warp break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Supplier, cotton and the sustainability card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Finishes, shrinkage and fastness tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The brand, the deadline and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Ten thousand metres the same, and not hiding the bad yardage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dye recipes
- weaves
- looms
- colour fastness
- shrinkage
- piece card
- warp
- textile finishes
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142