Automation index
How much of a Textile engineer’s job can AI already do?
A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Textile engineer
27%
AI can already do 27% of this job.
#165 / 623
View rankingTextile engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, weaves and piece QC.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, looms and the warp break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Supplier, cotton and the sustainability card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Finishes, shrinkage and fastness tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The brand, the deadline and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Ten thousand metres the same, and not hiding the bad yardage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dye recipes
- weaves
- looms
- colour fastness
- shrinkage
- piece card
- warp
- textile finishes
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141
IS WORK OVER?
Painter and decorator
17%
#586 / 623
View rankingPainter and decorator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quote, measure and pick colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Protect, mask and prep surfaces.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Paint, varnish and paper.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Repair texture, damp and cracks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Dealing with neighbours, communities and hours.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Invoice, buy material and travel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Quote, measure and pick colour
- Protect, mask and prep surfaces
- Paint, varnish and paper
- Repair texture, damp and cracks
- Invoice, buy material and travel
- pintor de brocha
- painter decorator
Sources for this job· O*NET 47-2141.00· ESCO/ISCO 7131