Automation index
How much of a Textile engineer’s job can AI already do?
A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Textile engineer
27%
AI can already do 27% of this job.
#165 / 623
View rankingTextile engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, weaves and piece QC.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, looms and the warp break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Supplier, cotton and the sustainability card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Finishes, shrinkage and fastness tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The brand, the deadline and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Ten thousand metres the same, and not hiding the bad yardage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dye recipes
- weaves
- looms
- colour fastness
- shrinkage
- piece card
- warp
- textile finishes
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141
IS WORK OVER?
Recycling-plant operator
19%
#517 / 623
View rankingRecycling-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Line, optical and the bale.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cabin, the one that sneaks in and the glass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Jam, the belt and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, the reject and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the lorry and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Sort for real, and a clean bale.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- recycling line
- bales
- sort cabin
- belts
- rejects
- glass
- optical sorters
- jams
Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132