IS WORK OVER?

Automation index

How much of a Textile engineer’s job can AI already do?

A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Textile engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, weaves and piece QC.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, looms and the warp break.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Supplier, cotton and the sustainability card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Finishes, shrinkage and fastness tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The brand, the deadline and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Ten thousand metres the same, and not hiding the bad yardage.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dye recipes
  • weaves
  • looms
  • colour fastness
  • shrinkage
  • piece card
  • warp
  • textile finishes

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Analyse my job

Jobs with similar scores

  1. 162Materials engineer27%
  2. 163Renewables engineer27%
  3. 164Hydraulic engineer27%
  4. 166Key account manager27%
  5. 167Linguist27%
  6. 168Nuclear medicine physician27%