Automation index
How much of a Textile engineer’s job can AI already do?
A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Textile engineer
27%
AI can already do 27% of this job.
#181 / 743
View rankingTextile engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, weaves and piece QC.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, looms and the warp break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Supplier, cotton and the sustainability card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Finishes, shrinkage and fastness tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The brand, the deadline and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Ten thousand metres the same, and not hiding the bad yardage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dye recipes
- weaves
- looms
- colour fastness
- shrinkage
- piece card
- warp
- textile finishes
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142