IS WORK OVER?

Automation index

How much of a Textile engineer’s job can AI already do?

A dye recipe comes earlier. Getting the colour the same over ten thousand metres do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Textile engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, weaves and piece QC.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, looms and the warp break.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Supplier, cotton and the sustainability card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Finishes, shrinkage and fastness tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The brand, the deadline and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Ten thousand metres the same, and not hiding the bad yardage.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dye recipes
  • weaves
  • looms
  • colour fastness
  • shrinkage
  • piece card
  • warp
  • textile finishes

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141

Wall tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and the tile format.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Adhesive, set and the tray fall.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cut, drill and the tile that splits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grout, seal and the bath junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the model change and the stock that is late.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ugly cut, and no leak.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tile walls
  • set out joints
  • bed tiles
  • tray fall
  • seal junctions
  • cut tiles
  • drill tile
  • grout

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 162Materials engineer27%
  2. 163Renewables engineer27%
  3. 164Hydraulic engineer27%
  4. 166Key account manager27%
  5. 167Linguist27%
  6. 168Nuclear medicine physician27%