Automation index
How much of a Thesis supervisor’s job can AI already do?
A chapter calendar comes earlier. The thesis existing without signing off plagiarism do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Thesis supervisor
27%
AI can already do 27% of this job.
#155 / 743
View rankingThesis supervisor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, chapters and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Draft, the comment and the one who will not rewrite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, ethics and not signing what was not done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Deposit, the board and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The department, the rush and not swallowing plagiarism.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the thesis exists, and not signing plagiarism.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thesis chapters
- drafts
- data ethics
- deposit
- the board
- plagiarism
- doctoral calendar
- rewrite
Sources for this job· O*NET 25-1081.00· ESCO/ISCO 2310
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142