IS WORK OVER?

Automation index

How much of a Thesis supervisor’s job can AI already do?

A chapter calendar comes earlier. The thesis existing without signing off plagiarism do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Thesis supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, chapters and the calendar.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Draft, the comment and the one who will not rewrite.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Data, ethics and not signing what was not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Deposit, the board and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The department, the rush and not swallowing plagiarism.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the thesis exists, and not signing plagiarism.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thesis chapters
  • drafts
  • data ethics
  • deposit
  • the board
  • plagiarism
  • doctoral calendar
  • rewrite

Sources for this job· O*NET 25-1081.00· ESCO/ISCO 2310

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 156Headteacher27%
  2. 157Hotel manager27%
  3. 158Spa manager27%
  4. 160Sporting director27%
  5. 161Curriculum designer27%
  6. 162Instructional designer27%