Automation index
How much of a Ticket inspector’s job can AI already do?
A validator comes earlier. Walking the train and dealing with no ticket do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ticket inspector
22%
AI can already do 22% of this job.
#448 / 733
View rankingTicket inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Validate, fares and the intervention note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Aisle, the group and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fines, data and what you can ask.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the full train and calling the conductor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The insult, keeping calm and not making a scene.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Charge fairly, and not skipping a coach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- validate tickets
- rail fares
- interventions
- on-train fines
- walk coaches
- call the conductor
- passenger data
- full trains
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142