IS WORK OVER?

Automation index

How much of a Ticket inspector’s job can AI already do?

A validator comes earlier. Walking the train and dealing with no ticket do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ticket inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Validate, fares and the intervention note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Aisle, the group and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fines, data and what you can ask.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the full train and calling the conductor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The insult, keeping calm and not making a scene.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Charge fairly, and not skipping a coach.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • validate tickets
  • rail fares
  • interventions
  • on-train fines
  • walk coaches
  • call the conductor
  • passenger data
  • full trains

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 384Stage manager22%
  2. 385Watchmaker22%
  3. 386Book restorer22%
  4. 388Cider maker22%
  5. 389Heat-pump technician22%
  6. 390Water technician22%