Automation index
How much of a Ticket inspector’s job can AI already do?
A validator comes earlier. Walking the train and dealing with no ticket do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ticket inspector
22%
AI can already do 22% of this job.
#463 / 753
View rankingTicket inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Validate, fares and the intervention note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Aisle, the group and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fines, data and what you can ask.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the full train and calling the conductor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The insult, keeping calm and not making a scene.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Charge fairly, and not skipping a coach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- validate tickets
- rail fares
- interventions
- on-train fines
- walk coaches
- call the conductor
- passenger data
- full trains
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165