IS WORK OVER?

Automation index

How much of a Ticket inspector’s job can AI already do?

A validator comes earlier. Walking the train and dealing with no ticket do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ticket inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Validate, fares and the intervention note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Aisle, the group and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fines, data and what you can ask.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the full train and calling the conductor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The insult, keeping calm and not making a scene.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Charge fairly, and not skipping a coach.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • validate tickets
  • rail fares
  • interventions
  • on-train fines
  • walk coaches
  • call the conductor
  • passenger data
  • full trains

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 375Stage manager22%
  2. 376Watchmaker22%
  3. 377Book restorer22%
  4. 379Cider maker22%
  5. 380Heat-pump technician22%
  6. 381Water technician22%