IS WORK OVER?

Automation index

How much of a Ticket inspector’s job can AI already do?

A validator comes earlier. Walking the train and dealing with no ticket do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ticket inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Validate, fares and the intervention note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Aisle, the group and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fines, data and what you can ask.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the full train and calling the conductor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The insult, keeping calm and not making a scene.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Charge fairly, and not skipping a coach.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • validate tickets
  • rail fares
  • interventions
  • on-train fines
  • walk coaches
  • call the conductor
  • passenger data
  • full trains

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112

Tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Layout, levels and ordering tile.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and grout.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Substrates, falls and awkward points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not staining the house.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and logs.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a floor that sounds hollow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Layout, levels and ordering tile
  • Cut, set and grout
  • Substrates, falls and awkward points
  • Site, client and not staining the house
  • Quantities, extras and logs
  • Not leaving a floor that sounds hollow
  • solador

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 375Stage manager22%
  2. 376Watchmaker22%
  3. 377Book restorer22%
  4. 379Cider maker22%
  5. 380Heat-pump technician22%
  6. 381Water technician22%