IS WORK OVER?

Automation index

How much of a Ticket inspector’s job can AI already do?

A validator comes earlier. Walking the train and dealing with no ticket do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ticket inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Validate, fares and the intervention note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Aisle, the group and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fines, data and what you can ask.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the full train and calling the conductor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The insult, keeping calm and not making a scene.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Charge fairly, and not skipping a coach.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • validate tickets
  • rail fares
  • interventions
  • on-train fines
  • walk coaches
  • call the conductor
  • passenger data
  • full trains

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112

Tow-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Call, route and the vehicle type.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hard shoulder, hook and traffic that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Hydraulics, bed and the low car that scrapes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Garage, the note and the client who argues.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Night, rain and not becoming the next crash.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not making the crash worse, and signing the hook.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hook vehicles
  • hard shoulder
  • the bed
  • recovery calls
  • crane hydraulics
  • recovery notes
  • traffic
  • low cars

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 375Stage manager22%
  2. 376Watchmaker22%
  3. 377Book restorer22%
  4. 379Cider maker22%
  5. 380Heat-pump technician22%
  6. 381Water technician22%