Automation index
How much of a Tiler’s job can AI already do?
A layout and an order come earlier. The first row coming out square does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tiler
17%
AI can already do 17% of this job.
#608 / 643
View rankingTiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Layout, levels and ordering tile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Cut, set and grout.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Substrates, falls and awkward points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, client and not staining the house.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quantities, extras and logs.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a floor that sounds hollow.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Layout, levels and ordering tile
- Cut, set and grout
- Substrates, falls and awkward points
- Site, client and not staining the house
- Quantities, extras and logs
- Not leaving a floor that sounds hollow
- solador
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122
IS WORK OVER?
Train conductor
21%
#435 / 643
View rankingTrain conductor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Consist, brakes and the departure sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Platform, close-up and the one left outside.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Incidents, Control and the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Ticket staff, the fare dodger and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the points and not leaving early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Leave nobody behind, and sign the consist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- train consist
- platform close-up
- departure sheet
- Control
- brake check
- line incidents
- halts
- delays
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312