IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Analyse my job

Jobs with similar scores

  1. 241Chemical engineer25%
  2. 242Interior designer25%
  3. 243Brewer25%
  4. 245Auto mechanic25%
  5. 246Meteorologist25%
  6. 247Motion designer25%