Automation index
How much of a Tool and die maker’s job can AI already do?
A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tool and die maker
25%
AI can already do 25% of this job.
#244 / 633
View rankingTool and die maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the die, clearances and the 3D drawing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, fit and try the tooling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Mount in the press, shoot and correct.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
EDM, polish and cavity finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Die maintenance and changeovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Die life and liability for the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make dies
- fit tooling
- run EDM
- try out tooling
- polish cavities
- mount in the press
- maintain moulds
- correct clearances
Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222
IS WORK OVER?
Building surveyor
22%
#321 / 633
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112