IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Education specialist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design schemes, rubrics and assessments.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Reports, diagnoses and school plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Train staff and accompany teams.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Observe class and feed back with care.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Families, inspectorate and EU projects.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not selling pedagogical fashion without a classroom.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design schemes, rubrics and assessments
  • Reports, diagnoses and school plans
  • Train staff and accompany teams
  • Observe class and feed back with care
  • Families, inspectorate and EU projects
  • pedagogo
  • pedagoga
  • education specialist

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 241Chemical engineer25%
  2. 242Interior designer25%
  3. 243Brewer25%
  4. 245Auto mechanic25%
  5. 246Meteorologist25%
  6. 247Motion designer25%