IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 241Chemical engineer25%
  2. 242Interior designer25%
  3. 243Brewer25%
  4. 245Auto mechanic25%
  5. 246Meteorologist25%
  6. 247Motion designer25%