IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 275Chemical engineer25%
  2. 276Interior designer25%
  3. 277Brewer25%
  4. 279Auto mechanic25%
  5. 280Meteorologist25%
  6. 281Motion designer25%