IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 280Chemical engineer25%
  2. 281Interior designer25%
  3. 282Brewer25%
  4. 284Auto mechanic25%
  5. 285Meteorologist25%
  6. 286Motion designer25%