Automation index
How much of a Tool and die maker’s job can AI already do?
A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tool and die maker
25%
AI can already do 25% of this job.
#244 / 633
View rankingTool and die maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the die, clearances and the 3D drawing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, fit and try the tooling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Mount in the press, shoot and correct.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
EDM, polish and cavity finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Die maintenance and changeovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Die life and liability for the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make dies
- fit tooling
- run EDM
- try out tooling
- polish cavities
- mount in the press
- maintain moulds
- correct clearances
Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222
IS WORK OVER?
Roofer
16%
#613 / 633
View rankingRoofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order material and set out slopes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tile, waterproof and finish ridges.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Heights, anchors and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, client and not cracking tiles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a leak the first winter.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Measure, order material and set out slopes
- Tile, waterproof and finish ridges
- Heights, anchors and weather
- Site, client and not cracking tiles
- Logs, quantities and extras
- Not leaving a leak the first winter
- techador
- cubiertas
- roofer
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111