IS WORK OVER?

Automation index

How much of a Tool and die maker’s job can AI already do?

A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tool and die maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the die, clearances and the 3D drawing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Machine, fit and try the tooling.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Mount in the press, shoot and correct.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
EDM, polish and cavity finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Die maintenance and changeovers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Die life and liability for the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make dies
  • fit tooling
  • run EDM
  • try out tooling
  • polish cavities
  • mount in the press
  • maintain moulds
  • correct clearances

Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222

Seismologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, catalogue and the location.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Quake, the analysis and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Alert, civil protection and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Field, the station and the one that dies.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The press, the rumour and not scaring.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Locate, and not over-alarming.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • quake catalogues
  • locate quakes
  • seismic network
  • alerts
  • civil protection
  • stations
  • rumours
  • quake analysis

Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 241Chemical engineer25%
  2. 242Interior designer25%
  3. 243Brewer25%
  4. 245Auto mechanic25%
  5. 246Meteorologist25%
  6. 247Motion designer25%