Automation index
How much of a Tool and die maker’s job can AI already do?
A CAD file and an electrode come earlier. Fitting the die so the run comes out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tool and die maker
25%
AI can already do 25% of this job.
#283 / 753
View rankingTool and die maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the die, clearances and the 3D drawing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, fit and try the tooling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Mount in the press, shoot and correct.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
EDM, polish and cavity finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Die maintenance and changeovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Die life and liability for the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make dies
- fit tooling
- run EDM
- try out tooling
- polish cavities
- mount in the press
- maintain moulds
- correct clearances
Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113