Automation index
How much of a Tower crane operator’s job can AI already do?
A load chart comes earlier. Lifting the beam without sweeping anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tower crane operator
18%
AI can already do 18% of this job.
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
E-learning trainer
27%
#154 / 643
View rankingE-learning trainer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, SCORM and the platform.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Tutoring, the forum and the one who vanishes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Assess, copying and the one who does not log in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Design, the video and not drowning in text.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the deadline and not delivering a dressed-up PDF.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they learn, and not dropping out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SCORM
- online tutoring
- forums
- platforms
- course script
- training videos
- assess online
- drop-out
Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351