IS WORK OVER?

Automation index

How much of a Tower crane operator’s job can AI already do?

A load chart comes earlier. Lifting the beam without sweeping anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Franchise consultant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pack, numbers and the profile.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Candidate, the unit and the one without capital.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Contract, royalties and not hiding them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Opening, the plan and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The network, the clash and not selling occupied territories.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Understand the risk, and not buying a dream.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • franchise packs
  • royalties
  • units
  • capital
  • openings
  • territories
  • contracts
  • candidate profiles

Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421

Analyse my job

Jobs with similar scores

  1. 580Shellfish gatherer18%
  2. 581Stonemason18%
  3. 582Port crane operator18%
  4. 584Excavator operator18%
  5. 585Shepherd18%
  6. 586Vehicle painter18%