Automation index
How much of a Tower crane operator’s job can AI already do?
A load chart comes earlier. Lifting the beam without sweeping anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tower crane operator
18%
AI can already do 18% of this job.
#663 / 723
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Non-commissioned officer
22%
#440 / 723
View rankingNon-commissioned officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drill, the trade and the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Barracks, the one who is late and the one who skives.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Guard, the weapon and not sleeping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, the mistake and not humiliating in public.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The officer, the order and not leaving the troops hanging.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they know the trade, and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill
- barracks
- guards
- weapons
- sheets
- the troops
- not humiliate
- the military trade
Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110