IS WORK OVER?

Automation index

How much of a Tower crane operator’s job can AI already do?

A load chart comes earlier. Lifting the beam without sweeping anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 690Shellfish gatherer18%
  2. 691Stonemason18%
  3. 692Port crane operator18%
  4. 694Excavator operator18%
  5. 695Shepherd18%
  6. 696Vehicle painter18%