Automation index
How much of a Tower crane operator’s job can AI already do?
A load chart comes earlier. Lifting the beam without sweeping anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tower crane operator
18%
AI can already do 18% of this job.
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Route planner
28%
#112 / 643
View rankingRoute planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Optimise, windows and capacity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Restrictions, tolls and the right vehicle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The salesperson who promises and the plan that will not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Recalc, incidents and the next day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The warehouse, the cut-off and not leaving the last one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it fits, and not blowing the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- optimise routes
- delivery windows
- tolls
- vehicle capacity
- recalc
- traffic restrictions
- warehouse cut-off
- driving hours
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323