Automation index
How much of a Tower crane operator’s job can AI already do?
A load chart comes earlier. Lifting the beam without sweeping anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tower crane operator
18%
AI can already do 18% of this job.
#633 / 693
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Schools inspector
27%
#173 / 693
View rankingSchools inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Visit, the rubric and the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Classroom, what happens and not the slide deck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Report, the school and not softening it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the union and not yielding the figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The minister, the pressure and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Say what is there, and not what they want to hear.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspection visits
- rubrics
- school reports
- real classrooms
- appeals
- not soften
- the department
- school evaluation
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422