IS WORK OVER?

Automation index

How much of a Tower crane operator’s job can AI already do?

A load chart comes earlier. Lifting the beam without sweeping anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Analyse my job

Jobs with similar scores

  1. 580Shellfish gatherer18%
  2. 581Stonemason18%
  3. 582Port crane operator18%
  4. 584Excavator operator18%
  5. 585Shepherd18%
  6. 586Vehicle painter18%