Automation index
How much of a Tower crane operator’s job can AI already do?
A load chart comes earlier. Lifting the beam without sweeping anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tower crane operator
18%
AI can already do 18% of this job.
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Stagehand
19%
#555 / 643
View rankingStagehand
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plot, marks and the weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Change, blackout and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Loads, pulleys and the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Technical rehearsal and the one who walks the light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The show, the surprise and not improvising loads.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Take nobody down, and the change on time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- blackout changes
- stage marks
- pulleys
- loads
- technical rehearsal
- sets
- the show
- weights
Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435