IS WORK OVER?

Automation index

How much of a Tow-truck driver’s job can AI already do?

A call and a route come earlier. Hooking on the hard shoulder without making the crash worse do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tow-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Call, route and the vehicle type.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hard shoulder, hook and traffic that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Hydraulics, bed and the low car that scrapes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Garage, the note and the client who argues.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Night, rain and not becoming the next crash.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not making the crash worse, and signing the hook.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hook vehicles
  • hard shoulder
  • the bed
  • recovery calls
  • crane hydraulics
  • recovery notes
  • traffic
  • low cars

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 441Urologist21%
  2. 442Teaching assistant20%
  3. 443Plastic surgeon20%
  4. 445Private-hire driver20%
  5. 446Dietitian20%
  6. 447Chief executive20%