Automation index
How much of a Tractor driver’s job can AI already do?
A field map comes earlier. Ploughing straight without running over the irrigation do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tractor driver
19%
AI can already do 19% of this job.
#554 / 643
View rankingTractor driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Field, implements and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plough, sow and the GPS that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Irrigation, the pipe and not running a wheel over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the implement that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the mud and not sinking the field.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A straight furrow, and not running over the irrigation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plough
- sow
- implements
- farm GPS
- fields
- grease the tractor
- pipe irrigation
- mud
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341
IS WORK OVER?
Aerospace engineer
25%
#233 / 643
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144