Automation index
How much of a Tractor driver’s job can AI already do?
A field map comes earlier. Ploughing straight without running over the irrigation do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tractor driver
19%
AI can already do 19% of this job.
#554 / 643
View rankingTractor driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Field, implements and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plough, sow and the GPS that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Irrigation, the pipe and not running a wheel over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the implement that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the mud and not sinking the field.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A straight furrow, and not running over the irrigation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plough
- sow
- implements
- farm GPS
- fields
- grease the tractor
- pipe irrigation
- mud
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341
IS WORK OVER?
Painter and decorator
17%
#606 / 643
View rankingPainter and decorator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quote, measure and pick colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Protect, mask and prep surfaces.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Paint, varnish and paper.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Repair texture, damp and cracks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Dealing with neighbours, communities and hours.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Invoice, buy material and travel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Quote, measure and pick colour
- Protect, mask and prep surfaces
- Paint, varnish and paper
- Repair texture, damp and cracks
- Invoice, buy material and travel
- pintor de brocha
- painter decorator
Sources for this job· O*NET 47-2141.00· ESCO/ISCO 7131