IS WORK OVER?

Automation index

How much of a Tractor driver’s job can AI already do?

A field map comes earlier. Ploughing straight without running over the irrigation do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tractor driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Field, implements and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plough, sow and the GPS that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Irrigation, the pipe and not running a wheel over.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the implement that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the mud and not sinking the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
A straight furrow, and not running over the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plough
  • sow
  • implements
  • farm GPS
  • fields
  • grease the tractor
  • pipe irrigation
  • mud

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 551Surgical technologist19%
  2. 552Weaver19%
  3. 553Occupational therapist19%
  4. 555Stagehand19%
  5. 556Valet19%
  6. 557Glassblower19%