IS WORK OVER?

Automation index

How much of a Tractor driver’s job can AI already do?

A field map comes earlier. Ploughing straight without running over the irrigation do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tractor driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Field, implements and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plough, sow and the GPS that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Irrigation, the pipe and not running a wheel over.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the implement that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the mud and not sinking the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
A straight furrow, and not running over the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plough
  • sow
  • implements
  • farm GPS
  • fields
  • grease the tractor
  • pipe irrigation
  • mud

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 650IVF laboratory technician19%
  2. 651Weaver19%
  3. 652Occupational therapist19%
  4. 654Stagehand19%
  5. 655Valet19%
  6. 656Glassblower19%