IS WORK OVER?

Automation index

How much of a Tractor driver’s job can AI already do?

A field map comes earlier. Ploughing straight without running over the irrigation do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tractor driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Field, implements and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plough, sow and the GPS that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Irrigation, the pipe and not running a wheel over.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the implement that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the mud and not sinking the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
A straight furrow, and not running over the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plough
  • sow
  • implements
  • farm GPS
  • fields
  • grease the tractor
  • pipe irrigation
  • mud

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Analyse my job

Jobs with similar scores

  1. 541Surgical technologist19%
  2. 542Weaver19%
  3. 543Occupational therapist19%
  4. 545Stagehand19%
  5. 546Valet19%
  6. 547Glassblower19%