IS WORK OVER?

Automation index

How much of a Trader’s job can AI already do?

An order book comes earlier. Executing without blowing the price do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Trader

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Book, liquidity and the ticket.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Execute, slippage and the one who panics.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Limits, risk and not blowing them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, P&L and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rumour, the news and not chasing.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Execute clean, and not blowing the price.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • order book
  • slippage
  • risk limits
  • P&L
  • liquidity
  • tickets
  • the close
  • news

Sources for this job· O*NET 41-3031.00· ESCO/ISCO 3311

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 187Switchboard operator27%
  2. 188Telemarketer27%
  3. 189Treasurer27%
  4. 191Transcriber27%
  5. 192Credit analyst26%
  6. 193Librarian26%