IS WORK OVER?

Automation index

How much of a Traffic engineer’s job can AI already do?

A microsim comes earlier. The junction not killing anyone without painting an extra lane do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Traffic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Counts, the model and the microsim.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Junction, the timings and the pedestrian.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the diversion and not choking the neighbourhood.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the councillor and not painting the miracle lane.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The crash, the figure and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the junction does not kill, and not painting extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • microsims
  • counts
  • junction timings
  • pedestrians
  • diversions
  • councillors
  • crashes
  • lanes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 175Reliability engineer27%
  2. 176Materials engineer27%
  3. 177Renewables engineer27%
  4. 179Hydraulic engineer27%
  5. 180Textile engineer27%
  6. 181Immunologist27%