Automation index
How much of a Traffic engineer’s job can AI already do?
A microsim comes earlier. The junction not killing anyone without painting an extra lane do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Traffic engineer
27%
AI can already do 27% of this job.
#178 / 733
View rankingTraffic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Counts, the model and the microsim.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Junction, the timings and the pedestrian.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the diversion and not choking the neighbourhood.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the councillor and not painting the miracle lane.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The crash, the figure and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the junction does not kill, and not painting extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- microsims
- counts
- junction timings
- pedestrians
- diversions
- councillors
- crashes
- lanes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142